2025 Projects
CRTPO Board Awards Over $35 Million for 20 Regional Transportation Projects
Investing in Roadway, Bicycle/Pedestrian, Air Quality Improvements, and Planning Studies
The CRTPO Board awarded funding for 20 transportation projects across its planning area, approving $35,332,319 in federal discretionary grant program funds at its March 19, 2025, meeting. These funds will support critical transportation needs in 14 CRTPO member jurisdictions spanning Iredell, Mecklenburg, and Union counties, helping communities improve mobility.
As the Metropolitan Planning Organization (MPO) for the Charlotte urban area, CRTPO oversees long-range transportation planning and ensures that Federal Highway Administration (FHWA) transportation funds are allocated and spent appropriately. In collaboration with the North Carolina Department of Transportation (NCDOT), CRTPO administers federal discretionary funds to help jurisdictions implement transportation projects, programs, and studies that might otherwise lack funding.
2024 Fall Call Discretionary Grants Program Funds Awarded by the CRTPO Board on March 19, 2025
| Location | Transportation Project Name | Awarded Funds |
| Centralina Regional Council | CONNECT Beyond Mobility Hub Guidebook and Training Project | $60,000 |
| Charlotte | NC 16 & Rozzelles Ferry Rd Intersection Improvements | $1,905,277 |
| Charlotte | Oakdale Rd Corridor Improvements (Lawing/Miranda Rds and Simpson/Sunset Rds) | $2,595,589 |
| Cornelius | Cornelius Bike and Pedestrian Plan | $120,000 |
| Davidson | Davidson Concord Rd Sidepath (South Prong Rocky River Greenway to River Run Neighborhood) | $1,743,770 |
| Davidson | West Branch, Carolina Thread Trail (West Branch Nature Preserve to River Run Neighborhood) | $1,276,363 |
| Huntersville | Stumptown Rd Extension (Aberfeld Rd to NC 115) | $6,103,076 |
| Huntersville | Oliver Hager Rd Extension and Roundabout at Ervin Cook Rd & S Birkdale Commons Parkway | $406,000 |
| Indian Trail | Indian Trail-Fairview Rd/Younts Rd/Stinson Hartis Rd Intersection Improvements | $5,231,384 |
| Indian Trail | Indian Trail Rd Improvements (Liberty Ln to Gribble Rd) | $1,321,600 |
| Marshville | US Hwy 74 Right Turn Lanes at Marshville Lake Park | $1,613,180 |
| Matthews | Moore Rd Sidewalk (Chambers Dr to Royal Commons Ln) | $374,819 |
| Matthews | Sam Newell Rd Multi-use Path (Crown Point Elementary School to Williams Rd) | $397,672 |
| Mecklenburg County | Electric Vehicle Fast Charging in Mecklenburg County (3205 Freedom Dr. Charlotte) | $667,094 |
| Mineral Springs | Mineral Springs – Downtown: NC 75 and Potter Rd Sidewalk and Pedestrian Improvements | $804,439 |
| Mooresville | North Main St Sidewalk and Crossing (Glastonbury Dr. to East Mooresville Intermediate School) | $1,252,099 |
| Mooresville | Rinehardt Rd Sidewalk (Selma Burke Middle School to E Plaza Dr) | $1,275,150 |
| Union County | Union County Critical Intersection Study | $160,000 |
| Waxhaw | Helms Rd Extension (Waxhaw Parkway West) (Waxhaw-Marvin Rd to NC 16) | $4,923,274 |
| Wesley Chapel | NC 84 & Potter Rd/Wesley Chapel Rd Intersection improvements | $3,101,533 |
| Total Funding Awarded | $35,332,319 |
Number of Projects Funded in the 2024 Fall Call for Projects
| Transportation Project Type | Funded Projects |
| Roadway | 9 |
| Bicycle & Pedestrian | 7 |
| Carbon Reduction (Air Quality) Projects | 1 |
| Local Planning Projects | 3 |
| Total Discretionary Grant Program Projects | 20 |
2024 Awarded Projects Archives
2024 Projects
Spring 2024 Supplemental Discretionary Grants
CRTPO Board approved $7.9 million of transportation funding for Mecklenburg and Union counties
The CRTPO Board approved $7.9 million following the annual 2024 spring call for existing discretionary projects that have experienced a funding shortfall at its July 17, 2024, meeting. The Project Oversight Committee (POC) reviewed the project submittals and validated that projects were scored appropriately and qualified for discretionary project funds based upon CRTPO’s Discretionary Grants Program Policy Guide.
Table 1 shows a list of projects and funds awarded. The 2024-2033 TIP has been amended to add funds to the selected projects.
Table 1 – Spring 2024 Supplemental Discretionary Grants
| Existing CRTPO Discretionary Project (Transportation Improvement Program Number) | Jurisdiction | Approved Discretionary Funds |
| Downtown Waxhaw Pedestrian and Bicycle Facility Enhancements (EB-5819) | Waxhaw | $106,166 |
| Torrence Chapel & West Catawba Ave – Corridors and Intersection Improvements (U-5906) | Cornelius | $7,773,306 |
| Total Awarded Spring 2024 Supplemental Discretionary Grants | $7,879,472 | |
CRTPO Board Awards Over $62 Million to Fund 25 Transportation Projects
Including Roadway, Carbon Reduction Projects, Bicycle/Pedestrian, and Planning Studies
The CRTPO Board awarded funding for several regional transportation projects at its meeting on February 21, 2024. The awarded funding allocations totaling $62,261,638 in discretionary grant program project funds, supports 25 projects across 12 CRTPO member jurisdictions in Iredell, Mecklenburg, and Union counties.
Fall 2023 Discretionary Funds Awarded by the CRTPO Board on February 21, 2024
| Location | Transportation Project Name | Awarded Funds |
| Centralina Regional Council | Regional Transportation Demand Management (TDM) Pilot Project | $48,000 |
| Charlotte | Morris Field Dr – Bridge Replacement | $1,735,844 |
| Charlotte | Brown-Grier Rd and Sandy Porter Rd – Corridor improvements (Brown-Grier – NC 160 to I-485 and Sandy Porter Rd – Williams Glen to Brown-Grier) | $11,116,400 |
| Charlotte | WT Harris Blvd & Sugar Creek Rd – Intersection Improvements | $1,337,991 |
| Charlotte | ITS infrastructure, traffic flow improvements and signal upgrades project (Sardis Rd/Rama Rd, Idlewild Rd, Mt. Holly Rd, and Wilkinson Blvd) | $3,917,563 |
| Charlotte | CATS Ballantyne I-485 Service – Purchase two battery-electric buses | $1,750,287 |
| Charlotte | Hornets Nest Park – Pedestrian Access Improvements | $1,030,080 |
| Charlotte | Rocky River Rd – Construct Shared Use Path (Rockland Dr to Old Concord Rd) | $1,981,365 |
| Charlotte | Improving Equity Analysis Using the Metrolina Regional Model | $48,000 |
| Cornelius | NC 115 & Hickory St – Intersection Improvements | $1,121,357 |
| Cornelius | Northcross Dr Extension (NC 73 to Westmoreland Rd) | $2,934,747 |
| Cornelius | Potts St & NC 115 – Intersection Improvements | $4,726,042 |
| Cornelius | Catawba Ave & US 21 – Intersection Improvements | $4,861,242 |
| Huntersville | NC 73 & McDowell Creek Greenway Extension – Grade Separation (McDowell Greenway to Lindholm Dr) | $3,095,280 |
| Indian Trail | Solar-powered Electric Vehicle chargers. Crooked Creek or Chestnut Square Park | $163,489 |
| Matthews | Greylock Ridge Rd Extension (E John St to Tank Town Rd) | $1,562,880 |
| Mint Hill | Bain School Rd – Construct Sidewalk (Gait Dr to Philadelphia Church Rd) | $1,163,421 |
| Mint Hill | Truelight Church Rd – Construct Sidewalk (Wilgrove-Mint Rd to Heather Nicole Ln) | $1,471,562 |
| Mint Hill | Lawyers Rd – Construct Sidewalk (Piaffe Ave to Thompson Rd) | $1,062,354 |
| Mooresville | East-West Connector Phase I – Construct roadway on new location (U-6239) (Langtree Rd to NC 115) | $6,717,719 |
| Mooresville | Patterson Heights – Construct Greenway (W Moore Ave to W Iredell Ave) | $2,526,392 |
| Statesville | US 21 Greenway Connector (Under Turnersburg Hwy) | $1,000,800 |
| Troutman | US 21/NC 115 Main St & Murdock Rd/Old Mountain Rd – Intersection Improvements | $3,546,901 |
| Union County | Union County Critical Intersection Analysis | $192,000 |
| Wesley Chapel | New Town Rd and Cuthbertson Rd – Roundabout Conversion | $3,149,922 |
| TOTAL FUNDING AWARDED | $62,261,638 |
| Transportation Project Type | Funded Projects |
| Roadway | 11 |
| Bicycle & Pedestrian | 8 |
| Carbon Reduction (Air Quality) Projects | 3 |
| Local Planning Projects | 3 |
| Total Discretionary Grant Program Projects | 25 |
Carry Over Projects
FY 2023 Planning Projects
| Project | Sponsor | Funds to be Carried Over into FY 2024 |
|---|---|---|
| Mint Hill Data Collection and Analysis | Mint Hill | $25,000 |
| Troutman Mobility Plan | Troutman | $36,250 |
| Mooresville Vision Zero Action Plan | Mooresville | $6,250 |
| Huntersville Mobility Plan | Huntersville | $62,500 |
| Union County | Union County | $60,000 |
| CONNECT Beyond Implementation | Centralina Regional Council | $366,037 |
| Silver Line Rail Trail | CATS | $53,750 |
| Total: | $609,787 |
FY 2022 Planning Projects
| Project | Sponsor | Funds to be Carried Over into FY 2024 |
|---|---|---|
| The Seam Advancement Study | Charlotte | $218,750 |
| Total: | $218,750 |
FY 2021 Planning Projects
| Project | Sponsor | Funds to be Carried Over into FY 2024 |
|---|---|---|
| I-77 and Jane Sowers Road Interchange Conversion (Feasibility Study) | Statesville | $6,250 |
2023 Awarded Projects Archives
2023 Projects
Spring 2023 Supplemental Discretionary Grants
CRTPO Board approved $3.5 million of transportation funding for Mecklenburg and Union counties
The CRTPO Board approved $3.5 million following the annual 2023 spring call for existing discretionary projects that have experienced a funding shortfall at its June 21, 2023, meeting. The Project Oversight Committee (POC) reviewed the project submittals and validated that projects were scored appropriately and qualified for discretionary project funds based upon CRTPO’s Discretionary Grants Program Policy Guide.
Table 1 shows a list of projects and funds awarded. The 2020-2029 TIP has been amended to add funds to the selected projects.
Table 1 – Spring 2023 Supplemental Discretionary Grants
| Existing CRTPO Discretionary Project (Transportation Improvement Program Number) | Jurisdiction | Approved Discretionary Funds |
| Downtown Waxhaw Pedestrian and Bicycle Facility Enhancements (EB-5819) | Waxhaw | $392,367 |
| NC 115 Widening (Mt. Holly-Huntersville Rd to Ramah Church Rd) (U-5908) | Huntersville | $3,144,600 |
| Total Awarded Spring 2023 Supplemental Discretionary Grants | $3,536,967 | |
Fall 2022 New Projects and Supplemental Funding to Existing Discretionary Projects
CRTPO Board Approves Over $59 Million to Fund 27 Projects,
including Roadway, Carbon Reduction Projects, Bicycle/Pedestrian and Planning Studies
The Charlotte Regional Transportation Planning Organization (CRTPO) Board approved funding for several regional transportation projects at its meeting on March 15, 2023. These funds support projects across the CRTPO planning area; investing in transportation needs to support our growing region. The CRTPO Board approved funding allocations totaling $59,089,000 in discretionary grants program funds, supporting 27 projects across 12 CRTPO member jurisdictions.
Approved Fall 2022 Discretionary-Funded Projects
| Project Name | Jurisdiction | Approved Discretionary Funds |
| Linking Transit and Land Use at the Community Scale: Training Series and Resources | Centralina Regional Council | $33,600 |
| DeArmon Rd – Complete Street Improvements (Benefield Rd – Browne Rd) | Charlotte | $5,486,000 |
| Lancaster Hwy at Providence Rd W – Intersection Improvements | Charlotte | $1,185,300 |
| CATS – Battery Electric Bus Chargers | Charlotte | $6,546,100 |
| Sugar Creek Rd Pedestrian Safety & Connectivity Project (Rumple Rd – Nevin Rd and Roman Rd – Graham St) | Charlotte | $2,425,000 |
| Albemarle Rd Pedestrian Safety & Connectivity Project (Redman Rd – Central Ave) | Charlotte | $1,756,000 |
| Beaty St -Shared Use Path (N Main St – Griffith St) | Davidson | $2,096,000 |
| Beaty St-Main St Intersection Improvements | Davidson | $2,063,000 |
| Greenway Tunnel under US 21 (Compass St – Shiv Dr) | Huntersville | $2,600,000 |
| Stumptown Road Extension at NC 115 | Huntersville | $5,156,000 |
| Indian Trail – Electrical Vehicle (EV) Chargers -EV chargers at Crooked Creek Park, Chestnut Square Park and Crossing Paths Park | Indian Trail | $468,000 |
| Town of Indian Trail Transportation Master Plan | Indian Trail | $120,000 |
| Pineville Matthews Rd (NC 51) – Shared Use Path (N Trade St – Independence Pkwy) | Matthews | $2,000,000 |
| John St Corridor Pedestrian and Bicycle Study (NC 51 – I-485) | Matthews | $120,000 |
| Lebanon Rd and Margaret Wallace Rd Sidewalk (Gristmill Ln – Idlewild Rd) | Mint Hill | $1,318,000 |
| Langtree Rd Widening (Lanyard Dr – Mt Mourne Lp) | Mooresville | $873,000 |
| Mazeppa Rd Grade Separation over NC 115 and Norfolk Southern Railroad – Intersection Improvements | Mooresville | $4,216,000 |
| Mecklenburg Hwy (NC 115) – Shared Use Path on Mecklenburg Hwy, and filling sidewalk gaps on Fairview Rd and Waterlynn Rd | Mooresville | $2,436,000 |
| Mooresville Mobility Plan | Mooresville | $160,000 |
| Stallings Silver Line Plan Integration | Stallings | $100,000 |
| NC 218 and Love Mill Rd – Intersection Improvements | Union County | $2,000,000 |
| Bonds Grove Church Rd and Waxhaw Marvin Rd – Intersection Improvements | Union County | $4,368,000 |
| Union Co. Transportation – Low Emission Alternative Fuel Conversion | Union County | $160,000 |
| Downtown Waxhaw Intersection Improvements along NC 16 and NC 75 | Waxhaw | $3,262,000 |
| Supplemental funds request: North University Research Park/I-85 Overpass (U-5874) (Research Dr – JW Clay Blvd) | Charlotte | $4,752,000 |
| Supplemental funds request: Four Mile Creek Greenway Crossing Under S Trade St (EB-5829) | Mecklenburg County | $344,000 |
| Supplemental funds request – Potts-Sloan-Beaty Connector | Davidson | $3,045,000 |
| TOTAL | $59,089,000 |
| Project Type | Funded Projects |
| Roadway | 11 |
| Bicycle & Pedestrian | 8 |
| Carbon Reduction (air quality) Projects | 3 |
| Local Planning Projects | 5 |
| Total Funded Discretionary Projects | 27 |
FY 2021 Planning Projects (carry over)
| Project | Sponsor | Original Funding Amount | Funds to be Carried Over into FY 2023 |
|---|---|---|---|
| I-77 and Jane Sowers Road Interchange Conversion (Feasibility Study) | Statesville | $242,000 | $302,500 |
2022 Awarded Projects Archives
2022 Projects
Spring 2022 Supplemental Funding to Existing Discretionary Projects
The CRTPO Board approved $3.9 million following the annual 2022 spring call for existing discretionary projects that have experienced a funding shortfall at its July 20, 2022 meeting. The projects were evaluated based upon the following measures within the CRTPO Discretionary Funds Guide Policy:
- Percent increase in CRTPO requests over the project’s original budget
- Most recent project phase completed (construction phase projects receive the highest priority);
- Percent of local funds committed for the shortfall request; and,
- The number of previous shortfall awards received for this project.
The list below shows the projects and funds awarded. The 2020-2029 TIP has been amended to add funds to these projects.
| Project Name | Jurisdiction | Approved Discretionary Funds |
| Concord Rd & Robert Walker Dr Roundabout Conversion (U-6092) | Davidson | $1,526,000 |
| NC 115 & Faith Rd/Campus Ln Intersection Improvements (C-5529) | Mooresville | $846,000 |
| NC 75 and Old Providence Rd Intersection Improvements (U-6248) | Waxhaw | $1,552,000 |
| Total Spring 2022 Supplemental Discretionary Funding | $3,924,000 |
Fall 2021 Discretionary Funds Approved
The Charlotte Regional Transportation Planning Organization (CRTPO) Board approved funding for several regional transportation projects at its February 16, 2022, Board meeting. These funds support projects across the CRTPO planning area; investing in transportation needs to support our growing region. The CRTPO Board awarded $51,070,000 in discretionary project funds, supporting 18 projects across eight CRTPO jurisdictions.
CRTPO Board Approves Over $51 Million to Fund 18 Roadway, Bicycle/Pedestrian and Planning Studies
Discretionary Funds Approved
| Project Location | Project Name | Funds Approved |
|---|---|---|
| Charlotte | Eastway Dr at Shamrock Dr Intersection Improvement | $7,819,000 |
| Charlotte | WT Harris Overhead Street Lighting Installation Project (Mt Holly Huntersville Rd to I-85 N) | $998,000 |
| Charlotte | Robinson Church Rd Widening (WT Harris to Plott Rd) | $6,227,000 |
| Charlotte | Margaret Wallace Rd and Arequipa Dr Intersection Improvement Project /Arequipa Dr Ext. | $9,336,000 |
| Charlotte | Rail Trail Pedestrian Bridge over Belk Freeway (I-277) (E Morehead St to Stonewall Light Rail Station | $1,903,000 |
| Charlotte | Irwin Creek Greenway (Clanton Rd to Lester St). The project is sponsored by Mecklenburg Park and Recreation | $4,872,000 |
| Charlotte and Pineville | Grants to Replace Aging Diesel Engines (GRADE) – Charlotte and Pineville’s Norfolk Southern Railway Railyards (Locomotive’s switch replacements). The project is sponsored by Mecklenburg County Air Quality | $3,815,000 |
| Huntersville | Town of Huntersville Mobility Plan | $128,000 |
| Huntersville | NC 115 Corridor Improvements (McCord Rd to Sam Furr Rd) | $5,980,000 |
| Matthews | Greylock Ridge Rd (E John St to E Charles St) | $748,000 |
| Matthews | Greylock Ridge Rd Extension (E Charles St to Tank Town Rd) | $2,725,000 |
| Matthews | Four Mile Greenway Underpass at S Trade St (S Trade St to E John St) | $499,000 |
| Mint Hill | Traffic Data Collection and Analysis (Critical Intersection Analysis) | $120,000 |
| Mooresville | Vision Zero Action Plan | $48,000 |
| Mooresville | Mooresville Sidewalk Package (White Oak Rd, Maple Ave, McNeely Ave, Rocky River School) | $1,979,000 |
| Mooresville | South Elementary School to Mooresville Middle School Greenway Connectors (multiple connections) | $1,833,000 |
| Troutman | Troutman Mobility Plan | $96,000 |
| Weddington | Potter Rd at Forest Lawn Dr Intersection Improvements | $1,944,000 |
| Project Type | Funded Projects |
|---|---|
| Roadway | 8 |
| Bicycle & Pedestrian | 5 |
| Grants for Replacing Aging Diesel Engines (GRADE) | 1 |
| Local Planning Projects | 4 |
| Total Funded Discretionary Projects | 18 |
Planning Projects
FY 2022 Local Planning Projects
| Project | Sponsor | Funds Approved |
|---|---|---|
| Charlotte to Mooresville Trail | Charlotte | $146,000 |
| Downtown Traffic Improvements Study | Mooresville | $60,000 |
| Transportation Unit Feasibility Study | Mooresville | $60,000 |
| Downtown Origin-Destination Study | Waxhaw | $48,000 |
| Total | $314,000 |
2021 Awarded Projects Archives
2021 Projects
FY 2021 Local Planning Projects Carryover
| Project | Sponsor | Original Funding Amount | Funds to be Carried Over into FY 2022 |
|---|---|---|---|
| I-77 and Jane Sowers Road Interchange Conversion (Feasibility Study) | Statesville | $242,000 | $242,000 |
| Transportation Master Plan | Iredell County | $120,000 | $12,000 |
| Total | $362,000 | $254,000 |
CRTPO Board approves $11 million of transportation funding for Iredell, Mecklenburg and Union counties
Spring 2021 Supplemental Funding to Existing Discretionary Projects
The CRTPO Board approved $3.3 million following the annual 2021 spring call for existing discretionary projects that have experienced a funding shortfall at its June 16, 2021 meeting. The projects were evaluated based upon the following measures within the CRTPO Discretionary Funds Guide Policy:
- Percent increase in CRTPO request over the project’s original budget
- Most recent project phase completed (construction phase projects receive highest priority);
- Percent of local funds committed for the shortfall request; and,
- Number of previous shortfall awards received for this project.
Table 1 shows a list of projects and funds awarded. The 2020-2029 TIP has been amended to add funds to these projects.
Table 1 –Spring 2021 Supplemental Discretionary Funding
| Existing CRTPO Discretionary Project | Transportation Improvement Program Number | Jurisdiction | Approved Discretionary Funds |
|---|---|---|---|
| New Town Rd and Marvin Rd Intersection Improvements | U-6088 | Marvin | $362,000 |
| Downtown Waxhaw pedestrian and bicycle facility enhancements | EB-5819 | Waxhaw | $100,000 |
| Potter Rd and Wesley Chapel Rd Intersection Improvements | U-6087 | Wesley Chapel | $594,400 |
| Potter Rd and Pleasant Plains Rd | U-5112 | Stallings | $2,197,600 |
| Planning Project: Mooresville to Charlotte Multi-Use Trail | Statesville to SC State Line | $60,000 | |
| Total Awarded Spring 2021 Supplemental Discretionary Funding | $3,314,000 |
COVID Relief Funds for Maintenance Projects
The CRTPO Board approved $7.9 million from a COVID relief bill (HIP-CRRSAA) that was enacted by Congress in December 2020 to address impacts of COVID-19 related to Highway Infrastructure Programs. The spirit of the Act is to get people back to work quickly. The CRTPO received $7,949,000 based on factors such as population share and lane miles.
Table 2 depicts the approved allocation of COVID relief funds to maintenance projects based upon county population share.
Table 2 – Summary of COVID Relief Funds County Allocation
| County | 2019 American Community Survey Population | County Population Share to Total CRTPO Planning Area Population | Pop-Based Allocation of Funds to NCDOT-Division Maintenance by County | NCDOT Division Requested Funds by County |
|---|---|---|---|---|
| Iredell | 175,538 | 12% | $942,127 | $975,000 |
| Mecklenburg | 1,074,475 | 73% | $5,766,793 | $5,721,450 |
| Union County* | 231,053 | 16% | $1,240,080 | $1,252,550 |
| Total CRTPO Est. Population | 1,481,066 | 100% | $7,949,000 | $7,949,000 |
* Population of Union County in the CRTPO Jurisdiction. COVID Relief Federal Funds Allocated to the CRTPO $7,949,000
The approved projects comprise various maintenance activities in Iredell, Mecklenburg, and Union counties. These maintenance projects are scheduled to start in 2022.
CRTPO Board Approves Over $34 Million to Fund 15 Roadway and Bicycle/Pedestrian Projects in Iredell, Mecklenburg, and Union Counties
The Charlotte Regional Transportation Planning Organization (CRTPO) Board approved funding for several regional transportation projects at its Board meeting on December 16, 2020. These funds support projects across three counties, investing in transportation needs to support our growing region. The CRTPO Board awarded $34,457,835 in discretionary project funds, supporting 15 projects across nine CRTPO jurisdictions.
Table 3 – Fall 2020 Discretionary Funding
Discretionary Funds Approved
| Location | EXISTING Highway Project Submittals | Funds Approved |
| Huntersville | Gilead Road Widening (Wynfield Creek Parkway to McCoy Road) | $1,990,000 |
| Davidson | Potts-Sloan Beaty Connector | $1,810,429 |
| Location | NEW Highway Project Submittals | Funds Approved |
| Charlotte | US 521 (Providence Road West to Ballantyne Commons Parkway) | $4,644,331 |
| Matthews | Weddington Road and McKee Road Intersection | $9,434,850 |
| Charlotte | Rea Road Widening (I-485 Outer Loop to Williams Pond Lane) | $6,673,940 |
| Matthews | Greylock Ridge Road (E. John Street to E. Charles Street) | $4,136,450 |
| Location | New Bicycle and Pedestrian Project Submittals | Funds Approved |
| Huntersville | The Park (Torrence Creek Greenway to Mt. Holly-Huntersville Road) | $1,746,025 |
| Mooresville | Moore Street Pedestrian Improvements (Church Street to Academy Street) | $1,199,640 |
| Marvin | Marvin Loop Trail | $1,024,050 |
| Mooresville | North Main Street – Sidewalk Extension to North Main Street Park | $1,187,440 |
| Marshville | Union Street Striping and Sidewalk Project | $317,680 |
| Location | New Planning Project Submittals | Funds Approved |
| Charlotte | Mooresville to Charlotte Trail (MCT) Advancement Study | $125,000 |
| Mooresville | Town of Mooresville – Downtown Traffic Improvements Study | $60,000 |
| Mooresville | Town of Mooresville – Transportation Unit Feasibility Study | $60,000 |
| Waxhaw | Town of Waxhaw – Downtown Waxhaw Origin-Destination Study | $48,000 |
2020 Awarded Projects Archives
2020 Projects
CRTPO Board Approves Discretionary Funds for Area Transportation Projects
The CRTPO approved funding to several regional transportation projects at its board meeting on February 19, 2020. These funds support projects across three counties, investing in transportation needs to support our growing region. The CRTPO Board awarded $55.4 million in discretionary project funds supporting 28 projects across 17 CRTPO jurisdictions.
| Municipality | Project | Funds Approved |
| Existing Roadway Projects | ||
| Indian Trail | Unionville-Indian Trail Road & Sardis Church Road Intersection (U-5987) | $1,185,693 |
| Indian Trail | Old Monroe Road Widening (Morningside Meadow Lane to Wesley Chapel Road) (U-4714B) | $5,000,000 |
| Davidson | Potts-Sloan-Beaty Connector (U-5907) | $1,430,000 |
| Charlotte | North University Research Park & I-85 Overpass (U-5874) | $3,753,632 |
| Pineville, Charlotte | NC 51 Access Management (Park Road to Carmel Road) (U-6086) | $3,643,166 |
| Statesville | Brookdale Drive-US 21 Connector (U-6054) | $1,049,655 |
| New Roadway Projects | ||
| Iredell County | Cornelius & Perth Road Roundabout Conversion (W-5212J) | $1,485,000 |
| Charlotte | Monroe Road & Idlewild/Rama Road Intersection (U-5805) | $4,240,000 |
| Wesley Chapel | Newtown Road & Waxhaw-Indian Trail Road Intersection (W-5710Y) | $1,385,234 |
| Monroe | NC 84 & Rocky River Road Intersection | $1,676,000 |
| Wesley Chapel | NC 84 & Potter Road Intersection | $2,229,562 |
| Waxhaw | NC 75 and Old Providence Road Intersection Improvement | $1,640,000 |
| Mooresville | NC 115 & Langtree Road Intersection | $4,053,230 |
| Indian Trail | Unionville-Indian Trail Road & Indian Trail Road Intersection Improvements | $2,729,480 |
| Transit Project | ||
| Huntersville | I-77 & Hambright Road Park & Ride (TA-6724) | $9,427,500 |
| Existing Bicycle and Pedestrian Projects | ||
| Cornelius | McDowell Creek Greenway Phase II (Westmoreland Road to W. Catawba Avenue) (EB-5817) | $1,025,566 |
| Huntersville | Upper McDowell Creek Greenway (Grade Separation at NC 73) (EB-5785) | $1,792,000 |
| Mooresville | Mooresville Middle School Area Sidewalk (C-5531) | $640,647 |
| Charlotte | Stewart Creek Greenway (State Street – Rozzelles Ferry Road) (EB-5781) | $1,444,844 |
| Matthews | Sam Newell Road Multi Use Path (Crestdale School to south of Williams Road) (EB-5783) | $834,272 |
| New Bicycle and Pedestrian Projects | ||
| Charlotte | W.T. Harris Boulevard Sidewalk (Plaza Road to Grier Road) | $1,228,800 |
| Mint Hill | Lawyers Road & Wilgrove-Mint Hill Road Sidewalk Extensions | $1,504,500 |
| Charlotte | W.T. Harris Boulevard Shared-Use Path (N. Tryon St – JW Clay Blvd) | $997,200 |
| Planning Projects | ||
| Union County | Union County Critical Intersection Analysis Traffic Engineering and Cost Estimate Project Phase 2 | $100,000 |
| Town of Davidson | West Branch Greenway Planning, Design, Engineering Study | $121,000 |
| Town of Waxhaw | Waxhaw Parkway West Segment – Alignment Study | $160,000 |
| Iredell County | Iredell County Transportation Master Plan | $120,000 |
| Statesville | I-77 and Jane Sowers Road Interchange Conversion (Feasibility Study) | $242,000 |